Showing posts with label Heat Exchanger. Show all posts
Showing posts with label Heat Exchanger. Show all posts

Heat Exchanger Redesign

>> Sunday, March 10, 2013

Finished HEX
I recently decided to build an upgraded version of my heat exchanger. The old one is based on a Rubbermaid cooler and has worked well but I know at some point the plastic is going to crack. I also thought I could have done a better job enclosing the element connections. Another issue is the half coupling used to mount the element; it has a tendency to pool water around the base of the element resulting in some rusting. This time I’ll be using a stainless nut that should allow the water to drain away from the element base. More on mounting the elements later.

My redesign is inspired by "The Electric Brewery" brew system. Kal's system is extremely well thought out and I’ve borrowed some of his ideas in the past for my own setup. Kal uses a HERMS coil in his HLT and I believe this design works well, but I really like the size of my HEX and the flexibility that comes from using a standalone HEX (e.g. the ability to change mash temps independently of the HLT temps). I figured I could take Kal’s design and implement it on a smaller scale and retain the flexibility and functionality of my design.

I started looking into vessels that I could modify to suit my needs. I wanted stainless steel so that it was easy to clean and would last a long time. I ended up settling on a 2.25 gallon Bain Marie pot that I picked up at my local Asian market. It seems to be well-made and at $10.99 it was pretty cheap. The material is thin but these things are made to be repeatedly submerged in boiling or near boiling water, so it should hold up to mashing temperatures.

I also bought some used Greenlee radio chassis punches off eBay. These punches were used to create the holes for mounting the HERMS coil (13/16”) and heating element (1 ¼”). The 13/16” Greenlee punch creates perfect sized holes for mounting ½” fittings which is what I’m using. The punches are really nice because they give you a perfectly round burr-free hole. They can be a little pricey if you buy them brand new, but if you’re patient you can usually find used ones on eBay for half the price of new.

All fittings on the HEX are weldless and are Blichmann-style as described on Kal’s site. If you’re considering doing something like this I highly recommend checking out Kal’s site first because he as some great information.

Drilling the Bain Marie Pot
Marking the pot for drilling
My design called for mounting the HEX input/output through the wall of the pot so I needed to drill a couple holes. Going through the side of the pot will allow the coil to drain better after each use. Compared to my original design, it will also allow for better clearance when attaching hoses or moving the temp probe from the startup position to the recirculation position.

I marked the pot 1.25 inches on vertical center from the top and bottom of pot. I started out with smaller bits then worked up to larger bits until I was able to use the 13/16” punch. If you haven’t drilled stainless steel before, it’s worth mentioning that it work hardens; the hotter it gets, the harder it gets. When drilling it’s important to go slow, use a fair amount of pressure, and use lubricant to keep it from heating up too much. 4-in-1 oil works well for this as does vegetable oil and I’ve heard of people also using motor oil.

Like my original build, the heating element will be mounted through the bottom of the pot. The bottom was drilled out like the side and the 1 ¼” punch was used to create the hole for the water heater element.

Mounting the Heating Element
Sink drain wrench
Due to space limitations, I mounted the heating element through the bottom of the pot rather than the side like in Kal’s HLT. Except for that, the mounting design is basically the same as Kal’s. Kal has great step by step directions on his site, so I won’t repeat them here. The key components are a 1” stainless nut, o-ring, washer, stainless double gang blank cover, double gang box, and an all-weather cover.

One thing I had to contend with was due to the shape of the pot there wasn't enough room to tighten the element nut with a regular wrench. This isn't an issue when you mount the element through the side of a pot. I ended up buying a sink drain wrench and modding it into a custom crowfoot-style wrench. I used my grinder to remove some material from the jaws to get it to fit the nut. I also trimmed off the excess where needed to get it to fit inside the pot. Th image to the left is what I ended up with and I must say that it gripped the nut very well and allowed me to really tighten it down.

Forming and Mounting the HERMS Coil
I decided to use copper tubing again for my HERMS coil. I was considering using stainless tubing but it is notoriously difficult to bend by hand without kinking; the tighter the radius the more difficult it is. Considering the relatively small diameter of my pot, even the copper was somewhat difficult to bend without kinking. I used 10 feet of ½” I.D. copper tubing and formed it in three stages. First was shaping it into a rough cylindrical-shaped coil. Next I wrapped the tubing around a mini crockpot to refine the shape and tighten it up a bit. Lastly I used a roll of duct tape to form an even tighter coil. There was some slight deformation of the tubing, but not too much and no kinks.

Ports for input/output
I used 90 degree elbows on the ends of the coiled tubing to transition to rigid copper pipe. Stainless compression fittings attach to the rigid pipe, which connect to stainless nipples to form the bulkhead. This is attached to the pot Kal/Blichmann style which forms a very solid and water tight connection. It’s also worth mentioning, I had to use an assortment of 45 degree fittings to clear the heating element at the bottom of the coil.

Miscellaneous Fittings and Final Assembly
Test fitting the coil
Pot filled with water and testing for leaks
The fittings on this project are by far the most expensive part. Stainless isn't cheap, but I think it’s worth it in this case. All the threaded fittings where wrapped in Teflon tape then everything was assembled and leak tested. I still need to order a 1/4" stainless fitting for the temp probe, but it's basically ready to use. Next week will be the inaugural brew using the new heat exchanger.



Read more...

BCS-460 Brew Session

>> Monday, June 29, 2009

Today I’m documenting a full BCS-460 brew session. I’m brewing a Toasted Coconut Porter based on the recipe by Fujiura, the 1998 Homebrewer of the Year. I found the recipe on the Internet so hopefully it’s true to the original.

My disclaimer, I don't work for Embedded Control Concepts nor am I associated with them in any way. But I do think this is a great product and I'm excited about it so I thought it might be helpful to others by documenting a brew session from start to boil.


Grain Bill
9 lbs Maris Otter Pale Malt (2 Row)
1 lbs 9.6 oz Hugh Baird Chocolate Malt
9.6 oz Briess Crystal Malt - 80L
1.25 oz Northern Brewer [8.50 %] (60 min) Hops 35.9 IBU
0.60 oz Goldings, East Kent [5.00 %] (10 min) Hops 3.7 IBU
1 Pkgs London Ale III (Wyeast Labs #1318) Yeast-Ale

Mash Profile
Mash at 153 for 90 minutes

Recipe Notes
14.2 ounces toasted coconut. Use dried unsweetened coconut and toast on cookie sheet 15 min at 350 in oven or carefully toast in a fry pan. Rack beer onto coconut in secondary for 7 days.


My BCS-460-based HERMS
My HERMS consists of a Hot Liquor Tun, a Heat Exchanger, a Mash Tun, a March brew pump, and a BCS-460 equipped with two temperature probes. The BCS-460 is mounted remotely in the utility room in my basement. I ran some CAT 6 cable to the back patio and this is used to control the heating elements and also for connecting the temp probes. I also have two separate 20 amp GFCI circuits on the back patio. The HLT is connected to one of these circuits and the HEX is connected to the other. The heating elements are 1500 watt, 120 volt elements drawing approx 12.5 amps each. The solid state relays for controlling the heating elements and pump are mounted in the small electrical box mounted on the brew stand. The benefit of the BCS-460 controller is that it allows you to precisely control things like mash temp which helps the home brewer have more easily repeatable results. Check out my other blog posts for more info and pics of my HERMS. Check out http://www.embeddedcontrolconcepts.com/ for more info on the BCS-460.

















Brewing Process
I programmed my BCS-460 for a single infusion mash. At the very bottom of this post you'll find the text from the configuration file for my system. The process consists of 7 states.


System Startup
The first state is System Startup where the Heat Exchanger (HEX) is preheated and the strike water is heated in the Hot Liquor Tun (HLT). I’m using 1.5 quarts of strike water per pound of grain for this recipe and my brewing software calculated an initial strikewater temp of 165.3 was needed. Here you can see a screen shot of the BCS-460 at work during startup. One note, my laptop doesn’t have the greatest graphics card so I zoomed out in the browser to be able to capture as much of the screen as possible. As a result it cuts part of the bottom off of temp probe graphics. It took 44 minutes to heat 16.8 quarts to 165.3. Also, the HEX has two different positions for the HEX temp probe. During Startup, the Temp probe is inserted into the top of the HEX and is measuring the temp of the water in the HEX. At Dough-in, the HEX temp probe is switched to position 2 where it’s measuring the temp of the mash exiting the HEX. This state is exited by clicking on the Web Input 0 button.




Start Mash
The next State is Start Mash. This state is essentially a pause that allows for stirring the grain and strikewater into the mash tun. The heating elements in the HEX and HLT are turned off at this time. This state is exited by clicking on the Web Input 0 button.




Dough-In
The next state is Dough-in. This is simply a count-down timer for 6 minutes. When the timer reaches 0:00, the Dough-In state is exited and the Mash state begins. 6 minutes may seem a little short for dough in, but keep in mind before I kicked off this state I refilled the HLT, checked hoses, and swapped the HEX temp probe from position 1 to position 2. So the total dough-in time is probably closer to 15 minutes. Also, since the HEX temp has been switched to position 2 but the mash isn’t being circulated yet, the temp reading on the HEX isn’t accurate at this time.




Mash
During the Mash state, the mash is being recirculated through the HEX and the water in the HLT is heated for the sparge. The heating element in the HEX is cycled on as needed in order to maintain the mash temp. You can see in the pic below the temp of the mash exiting the HEX is at 153.1, the HLT is heating the sparge water, and the pump is active. Also, Timer 0 is used to countdown the 90 minute mash. When the timer reaches 0:00, the Mash state is exited to the Mash Out state.










Mash Out
During this state the temp of the mash is raised to 168. Once the mash out temp is reached, the state is exited to Start Sparge. The HLT is maintained at 165. As you can see it took a little under 7 minutes to raise the mash temp to 168.







Start Sparge
Similar to Start Mash, this state is essentially a pause that allows for swapping hoses and such. This is exited by clicking on the Web Input 0 button. Essentially everything is turned off.

Sparge
During this state the heating element in the HLT is turned off. The HEX is powered on when the sparge water drops below the setpoint of 170. This state is exited by clicking on the Web Input 0 button. At some point I’d like to add some float switches to control the end of this state.




The rest of the brewing process (boil and chilling) is manual, so that's about it as far as the BCS-460 controlled portion. Hopefully that was helpful to those that are considering purchasing a BCS-460 or have purchased one and were a little confused as to where to start.

Single Infusion Mash Configuration



Read more...

HERMS Equipment - Heat Exchanger

>> Sunday, March 01, 2009

The Heat Exchanger is based on a 2 gallon Rubbermaid cooler. It holds approximately 1.5 gallons of water and is heated by a 1500 watt 120 volt water heater element. The heat exchange is accomplished with 10 feet of 1/2" copper tubing.

Mash Tun >>







Read more...